Photovoltaic 315.12 Kwp

Power Controls and Systems (PCS) is proud to announce its participation in the 315.12 Kwp Photovoltaic project in Megapaca, located in El Progreso. This project, which was carried out during the period from October to December 2023, marks a significant step towards the adoption of solar energy in the region.
  • Project Photovoltaic 315.12 Kwp
  • Where El Progreso - Megapaca
  • Period October 2023 – December 2023
  • Labor service responsibility
WhatsApp Chat